Tender Reader
Reads tender packs and prepares a clear summary for quoting.
4 tender outputs prepared this month
- Last run
- Today, 9:14 AM
- Time saved
- 4.1h
- State
- Ready inside the demo portal only
A customer-facing demo snapshot showing fake pilot runs, reviewable example outputs, and conservative time-saved estimates.
Demo status
No live connections
Synthetic activity example
7
Tender summaries, quote-chasing drafts, and review notes are grouped here so the customer can see what Yardset would track without asking Tom for an update.
Estimated time returned
5.8h
A conservative demo estimate based on manual tender review and follow-up work.
Work completed
7 demo runs
Tender reviews and quote-chasing drafts are grouped in one place.
Time returned
5.8 hours
A conservative estimate of manual review and follow-up time saved.
Ready outputs
7 outputs
Each run links to a summary, draft, or review note.
Time saved is a demo estimate based on typical manual review and follow-up time for each run. Synthetic demo account only. Every organisation, run, output, status, and time estimate shown here is fictional. There is no login, client isolation, live customer data, or agent execution connected.
Reads tender packs and prepares a clear summary for quoting.
4 tender outputs prepared this month
Drafts RFQ follow-ups and tracks quote response gaps.
3 quote-chase drafts prepared as setup examples
Tender Reader
Scope, returnables, due dates, site notes, and pricing watch-outs were summarised for estimator review.
Tender Reader
A review note was prepared because the tender pack included safety material that should be checked before release.
Tender Reader
Key tender dates, addenda notes, and mandatory documents were extracted into a short review list.
Tender Reader
Tender Reader highlighted long-lead items, delivery constraints, and clarifications for the quote meeting.
Subbie Quote Chase
A demo follow-up pack was drafted for review. Nothing was sent to subcontractors.
Subbie Quote Chase
Short reminder wording was drafted for a demo concrete package response gap.
Subbie Quote Chase
The demo input was missing contact details, so the agent stopped and marked the follow-up for review.
| Run | Agent | Status | Time saved | Output |
|---|---|---|---|---|
Level 3 Office Fitout Scope, returnables, due dates, site notes, and pricing watch-outs were summarised for estimator review. | Tender Reader | Completed | 55 min | Tender summary ready |
Logan Central Service Centre A review note was prepared because the tender pack included safety material that should be checked before release. | Tender Reader | Blocked / Safety Review | 15 min | Review note ready |
School Amenities Upgrade Key tender dates, addenda notes, and mandatory documents were extracted into a short review list. | Tender Reader | Completed | 62 min | Tender dates extracted |
Civic Storage Shed Tender Reader highlighted long-lead items, delivery constraints, and clarifications for the quote meeting. | Tender Reader | Completed | 114 min | Risk list ready |
Subbie RFQ Pack Draft A demo follow-up pack was drafted for review. Nothing was sent to subcontractors. | Subbie Quote Chase | Setup / Test | 70 min | Draft pack ready |
Concrete Package Follow-up Short reminder wording was drafted for a demo concrete package response gap. | Subbie Quote Chase | Setup / Test | 22 min | Reminder copy drafted |
Services Package Check The demo input was missing contact details, so the agent stopped and marked the follow-up for review. | Subbie Quote Chase | Blocked / Review | 10 min | Review needed |